What should we do when the pipe extrusion output exceeds 700kg/h?

Views: 354 Author: Site Editor Publish Time: Origin: Site

2.25.jpg

When the pipe extrusion output of the energy-saving extrusion pipe production line exceeds 700kg/h, an internal air cooling system is generally required to cool the pipe. However, since there is no corresponding recovery device, the heat generated during the cooling process is usually removed directly. In order to effectively utilize these energy and save energy consumption and production cost, Jiangsu Xinrongplas Machinery Co., Ltd has developed a new type of heat recovery and utilization system. The system captures the heat energy released by the pipe during cooling and uses it to heat the feedstock. According to reports, in the process of recovering heat, the system can also accelerate the cooling of pipes, thereby shortening the cooling time of pipes.

The use of user-friendly operation control devices makes the operation management of extrusion production more intuitive, and also improves the responsiveness to special situations. In addition, the line offers several optimized engineering options to meet the flexibility and efficiency demands of extrusion production. These options include: reuse of recycled materials (such as expanded polyvinyl chloride, multi-layer polyethylene and polypropylene, etc.) to develop multi-layer pipe products; processing of new generation raw materials (such as polyethylene-RC, polypropylene-Rb and organic fillers, etc.) ; use a higher proportion of recycled materials and/or fillers; directly extrude recycled materials, etc.

Our company is professional in producing various plastic pipe production lines. You can consult relevant content at any time and look forward to our cooperation


×

Contact Us